daratechPLANT2004
|
![]() |
|
January 19 - 21, 2004 • Wyndham Greenspoint Hotel, Houston, Texas, USA |
Day One
| |||||||
Session 1A1: Asset Lifecycle Management Review & OutlookAdvances and future trends in commercial plant creation, operation and lifecycle maintenance solutions and integration frameworks as well as Daratech's view of the prospects and outlook for solution developers will be presented, together with market statistics and forecasts. | |||||||
|
Plant Lifecycle Management (620KB PDF File) | ||||||
Session 1A2: Keynotes from Process & Power IndustriesThe reality for owner-operators is that their manufacturing world is not easily integrated. These presentations will explore the cost benefits and business value of integrated engineering concepts from the owner-operator and EPC perspective. | |||||||
|
Presentation (0KB PDF File) | ||||||
|
Integrated Engineering in a Non-Integrated Manufacturing Environment (48KB PDF File) Abstract | ||||||
|
New Imperatives to Reduce Lifecycle Costs (2.45MB PDF File) Abstract | ||||||
Session 1A3: Previews of Solution Providers' Breakout SessionsExpect to see new technologies and early looks at new releases in these two-minute previews. This session will help you decide how to allocate your time during the breakouts. | |||||||
|
|
Alias Limited (333KB PDF File) | ||||||
|
|
Process Asset Lifecycle Management (243KB PDF File) | ||||||
|
|
AVEVA News with Nick Dunlop (159KB PDF File) | ||||||
|
|
Presentation (0KB PDF File) | ||||||
|
|
Busy 2003 for BitWyse (1.10MB PDF File) | ||||||
|
|
The Next Generation in Plant Design Software (1.00MB PDF File) | ||||||
|
|
Plant Design in the AutoCAD Environment (800KB PDF File) | ||||||
|
|
Cyra Technologies, Inc./Leica Geosystems (306KB PDF File) | ||||||
|
|
Documentum...a Fortune 500 EMC Company (221KB PDF File) | ||||||
|
|
Enterprise Solutions for Asset and Plant Lifecycle Management (279KB PDF File) | ||||||
|
|
Strategic Object Plant Engineering and PLM (118KB PDF File) | ||||||
|
|
Engineering is an Enterprise Issue (6.5MB PDF File) | ||||||
|
|
SimSci-Esscor...Delivering the Power of Simulation3 (0KB PDF File) | ||||||
|
|
Maximizing the Business Value of Engineering Content (502KB PDF File) | ||||||
| Microsoft Corporation |
This presentation not available. | ||||||
|
|
Oracle (377KB PDF File) | ||||||
|
|
Solve Tomorrow's Challenges. Today. (885KB PDF File) | ||||||
|
|
The Information Asset Company - TrinityCSA (0KB PDF File) | ||||||
Session 1P1: Engineering Cost Reduction Strategies: Work Process and Technology DirectionsThe reality for owner-operators is that their manufacturing world is not easily integrated. These presentations will explore the cost benefits and business value of integrated engineering concepts from the owner-operator and EPC perspective. | |||||||
|
Engineering Cost Reduction Strategies: Work Process and Technology Directions (380KB PDF File) | ||||||
|
Engineering Cost Reduction Strategies (71KB PDF File) | ||||||
Session 1P2: ALSTOM Power Project: An Owner/Operator and EPC Success StoryThe reality for owner-operators is that their manufacturing world is not easily integrated. These presentations will explore the cost benefits and business value of integrated engineering concepts from the owner-operator and EPC perspective. | |||||||
| |||||||
|
Alstom Power Plant Information Management Case Study: Project Cockburn (3.00MB PDF File) | |||||||
Session WS1P2: Cultural Change: Frustrations and SolutionsThis session will focus on how to drive cultural change with the minimum amount of disruption and impact on morale. Learn how this challenge is being tackled at Procter & Gamble and other organizations. In addition, participants will share their experience on how they coped with unwelcome changes themselves. | |||||||
|
Cultural Change: Frustrations and Solutions (617KB PDF File) | ||||||
Session 1P3: Justifying IT Investment in Tough TimesThe reality for owner-operators is that their manufacturing world is not easily integrated. These presentations will explore the cost benefits and business value of integrated engineering concepts from the owner-operator and EPC perspective. | |||||||
|
Using Six Sigma Techniques to Help Target Investment Opportunities (1.10MB PDF File) Abstract | ||||||
|
Justifying and Managing IT Investment (502KB PDF File) | ||||||
Session WS1P4: Technology Advances for Offshore PlatformsThe increasing depth of offshore platforms and the mix of floating and subsea production present unique challenges to platform designers. How can today's IT tools be used most effectively to reduce engineering cost, improve efficiency and reduce risk—while still delivering the best possible design? This session will explore topics such as FEA, implementing remote-office collaboration, managing all the data produced and consumed by the numerous applications involved, and change management. | |||||||
|
Update on the Kristin Project's Use of PIM, Based on Intergraph's SPF (378KB PDF File) | ||||||
|
© Copyright 2004 Daratech, Inc. All rights reserved. | |||||||